Mette Mikkelsen

10. mar. 20211 min

T-Pylon preparation at Hinckley, United Kingdom

Located in the centre of the project and set to connect high voltage energy from Hinkley Point C, to the UK transmission grid, The first foundations are ready for T-pylons to be installed.

Read more: https://hinkleyconnection.co.uk/

photo: Steven Haskayne, Nationalgrid

    860
    0