- Mette Mikkelsen
T-Pylon preparation at Hinckley, United Kingdom
Located in the centre of the project and set to connect high voltage energy from Hinkley Point C, to the UK transmission grid, The first foundations are ready for T-pylons to be installed.
Read more: https://hinkleyconnection.co.uk/

photo: Steven Haskayne, Nationalgrid